So here is the reason I am holding the turn for the moment, we really need to decide this turn if we try to grab 2nd religion or if we are content with third.
Our capital finished its HS and could now:
- run a HS project or build a Shrine to go for religion
- build a builder next to improve Cow, chop Campus Forest, connect pearls/go to 3rd city
- build a Monument to get quicker to Political Philosophy.
Here is why I think this is a big decision, I had a look at my city sites and their production capabilites. Nearly all cities only get 3 tiles where I can build

increasing improvements quickly and a re very limited in total production.
I am guessing that Roland has picked Choral Music to spread his religion to Indonesia and help her to get to her special unit fast to dominate the seas. So I am hopeful that Work Ethic might still be available.
Let us have a look, the key is:
-
4 point star = Lumbermill
-
5 point star = mine
-
6 point star = Lumbermill on jungle (Mercantilism, renaissance era)
TB
Has 1 Lumbermill in 1st ring and 1 Mine in 2nd ring.
Basically needs to buy the two 3rd ring forests and build Lumbermills there to get to 4

tiles.
Has 2 mine locations 3rd ring which can be shared with Miln and probably 3rd city.
That is a total of 6 tiles, considering that all our tiles are 2

we have no need working any food tiles like the cattle or any farms as long as we are running no specialists. That means TB is capping its productivity quickly at size 7 as the PHJ is also a decent tile (we could consider turning it into a mine to exchange 1

for 1
Total expected

output of TB at size 7:
- CC 2

+ PHJ 2

+ 3* GHMine 2

+ 3* GFLumbermill 3

+ Palace 2

= 21
This gets 3

increases at Appreniceship -> Industrillization -> Steel (+6 as it also improves JLumbermills)
Mercantilism lets us work 2* PJLumbermills and improves our PHJ by +2
Most of these techs come relatively late outside of Apprenticeship, the order will very likely be something like this:
Apprenticeship ~T80 => Mercantilism ~T120 => Industrilization ~T150 => Steel ~T180
This is really low in terms of production, getting Work Ethic would bring TB 3

, 6 with the double adjacency card. 4 / 8 when the 3rd adjacent district will be build. That is a 15% / 30% later then 20% / 40% increase on
Miln
Is even worse off, it has 2 PHJ and a GHQuarry 2nd ring and the shared GHMine with TB 3rd ring. It also has a DH we can mine, but that will be bad tile all game long.
There is one place for a potential PJLumbermill later and I think we need to keep it for that else it would have been a decent spot for an industrial district (yellow outline).
Total expected

output of Miln at size 5:
- CC 1

+ 2* PHJ 2

+ GHStoneQuarry 3

+ GHMine 2

= 10
The HS would bring 2 / 4, later 3 / 6 when its 2nd district the Campus will be finished. That are 20% / 40% and later 30% / 60% increases. Even with a WE HS here this city is never going to be very productive.
3rd
Another very low

site. It is not yet decided where to settle, but

will be of utmost importance here. From what we see now, there are:
2* PHJ 2

+ 3* PJ 1

(one we might settle on) and the shared GHMine with the capital (maybe 2 depending on where we settle)
This place will be even lower in

than Miln but has possibly great HS adjacency sites (the marsh would be +4 from the get go).
Expected Work ethic production increase ~100%
4th
The pinnacle of desolation is this place, as it can only sustain a population of 2.
I think we need to move it onto the cotton to have a decent

site. However we do not have a way to feed this city outside of "feed the world", which is a counter argument to "Work Ethic" and rushing.
In any case this city needs the Volcano to go off and add

yields to its tiles, sadly this will destroy the resources and forests on 3 of its better tiles. Many tiles are 3rd ring, so expensive to get.
Expected Work Ethic production increase ~20%
Expected use benefit of "Feed the World", huge as it is basically necessary until the volcano adds
Rush next GP possibility:
CMF eta GPP
T36 1st Lavra (+2)
T38 4GPP (finish 2nd Lavra => +4)
T39 8GPP
T52 60 GPP after me in turn order is his latest finish date
Japan eta GPP
T39 1st HS (+1)
T41 2 GPP (finish 2nd HS => +2)
T43 6 GPP +13 GPP Project in TB finishes
T47 27 GPP + 2* 13 GPP projects in TB and Miln finish
T51 61 GPP
The total investment would be 42

per project, so 126

with a high risk of failing as CMF needs to run only 1

roject: himself or build an early shrine by latest T46 so we cannot overtake him.
We could chop the forest into one project to improve our eta, but then we would invest even more into it. It is basically the only option I see to get there on time.
What do you guys think?
Be content with Feed the World or give this gamble a shot?